Identify at least 5 software risk. Discuss each.

  • Risk Avoidance is just that, avoiding the risk associated with a specific task, activity or project. Often, following the review of a contract, it is determined that a project is just too risky. The client may decide not to bid the work at all, or remove that element of the work from their bid, sometimes using an alternate deduct to delineate the exclusion. Risk avoidance is strictly a business decision, and sometimes a very good strategy if construction documents are unclear, ambiguous or incomplete.
  • Risk Abatement is the process of combining loss prevention or loss control to minimize a risk. This risk management strategy serves to reduce the loss potential and decrease the frequency or severity of the loss. Risk abatement is preferably used in conjunction with other risk management strategies, since using this risk management method alone will not totally eliminate the risk.
  • Risk Retention is a good strategy only when it is impossible to transfer the risk. Or, based on an evaluation of the economic loss exposure, it is determined that the diminutive value placed on the risk can be safely absorbed. Another consideration in retaining a risk is when the probability of loss is so high that to transfer the risk, it would cost almost as much as the cost of the worst loss that could ever occur, i.e., if there is a high probability of loss, it may be best to retain the risk in lieu of transferring it.
  • Risk Transfer is the shifting of the risk burden from one party to another. This can be done several ways, but is usually done through conventional insurance as a risk transfer mechanism, and through the use of contract indemnification provisions.
  • Risk Allocation is the sharing of the risk burden with other parties. This is usually based on a business decision when a client realizes that the cost of doing a project is too large and needs to spread the economic risk with another firm. Also, when a client lacks a specific competency that is a requirement of the contract, e.g., design capability for a design-build project. A typical example of using a risk allocation strategy is in the formation of a joint venture.